South Gate Tanjung Barat

Waterproofing Project

South Gate Tanjung Barat

Completion Date
Product
Volume
2020
HPI System
36,595 m3

Area Completed : Raft Foundation, Basement 3 slab, Retaining Wall, STP, GWT, Fire Tank, Suspended Swimming Pool at LG and Suspended Swimming Pool slab at Level 8(Apartment) 

Architect

PT. Airmas Asri

Engineer

PT. Stadin Strukturindo Konsultan

Contractor

PT. Tatamulia Nusantara Indah

Developer/Owner

PT. Duta Semesta Mas (Sinarmas Group)

× Whatsapp