Jl. Raya Bogor, Kelurahan Jatijajar, Tapos Kota Depok
Completion Date
Product
Volume
2023
HPI System
2,298 m3
Area Completed : Cable Trench 1-7, Slab and Wall of Manhole, Slab and Wall of Pit Lift, Sump Pit of Pump Room, Slab and Wall of Pump Room, Slab and Wall of Fire Water Tank, Ground Water Tank, Slab and Wall of Genset Room, Loading Dock, Slab and Wall of Sewage Treatment Plant.